Cladded Curtain Wall Systems
Vertical carrier and horizontal carrier profiles required cutting, hole, channel and so on. operations are completed. Vertical carrier aluminum profiles are hung on the floor slabs of the structure to be cladding and adjustable anchors connected from the forehead. Horizontal bearing profiles are connected between the vertical carriers hanging sequentially to the façade to be dressed and a grid system is formed to form the façade.
After placing the glass or the material covering the cavity to the curtain wall system with the grid system formed from outside, the pressure covers holding the glass are screwed to the vertical and horizontal profiles and the closure covers are attached and the application is completed. It also requires the use of EPDM or silicone based wicks suitable for the facade system in order to provide the necessary insulation and sealing of the curtain wall system. When it is desired to have a window sash on the curtain wall system, window production can be realized between the formed grid system by using the joinery profiles suitable for the system series.